Climate × cost intelligence
Where climate impact meets dollar impact.
Groundshift turns the bills and machine data you already have into a plan that lowers cost and emissions, and proves it.
September bills
Reading the bills
Two PDFs from September: electricity for Plant A and an LPG delivery.
Working out emissions
Grid electricity at Thailand’s grid factor; LPG at its combustion factor.
Checked the totals
The line items add up to each bill’s total.
I read 2 bills and found 6 line items: ฿512.4K and 58.7 tCO₂e in total.
On-peak electricity at Plant A is up on August. Review the results, then save them to see this on Home.
Reply to the agent…
Home
Cost and emissions across your sites.
฿0.00M
0.0tCO₂e
0%
Cost and emissions over time
Daily, compared with the previous 30 days.
cost · THB
- This period
- Previous
emissions · tCO₂e
- This period
- Previous
Q4 energy plan
฿0.0K
0.0tCO₂e
012
0 / 00 / 10 / 2
About this plan
Quick wins from September’s bills: a tariff change and a drift fix, with no new hardware.
Move Plant A to the time-of-use tariff
Fix compressor drift at Warehouse B
September bills
Reading the bills
Two PDFs from September: electricity for Plant A and an LPG delivery.
Working out emissions
Grid electricity at Thailand’s grid factor; LPG at its combustion factor.
Checked the totals
The line items add up to each bill’s total.
I read 2 bills and found 6 line items: ฿512.4K and 58.7 tCO₂e in total.
On-peak electricity at Plant A is up on August. Review the results, then save them to see this on Home.
Reply to the agent…
Home
Cost and emissions across your sites.
฿0.00M
0.0tCO₂e
0%
Cost and emissions over time
Daily, compared with the previous 30 days.
cost · THB
- This period
- Previous
Q4 energy plan
฿0.0K
0.0tCO₂e
012
0 / 00 / 10 / 2
About this plan
Quick wins from September’s bills: a tariff change and a drift fix, with no new hardware.
Move Plant A to the time-of-use tariff
Fix compressor drift at Warehouse B
01Why now
Climate pressure is now business pressure.
- 01
Energy prices
Every kilowatt costs more than last year’s budget assumed.
Rising
- 02
Compliance costs
Disclosure rules arrive faster than teams can staff them.
Tightening
- 03
Buyer expectations
Large buyers now ask their suppliers for emissions, not just prices.
Required
- 04
Cross-border rules
Carbon at the border becomes a cost at the border.
Incoming
The companies that win treat it as a cost problem they can solve, not a report they have to file.
02The problem
Data exists. But intelligence doesn’t.
Factory and office data don’t connect.
Bills, meters and spreadsheets live apart, and stitching them together eats time and money every month.
Operations, cost and carbon aren’t linked yet.
Finance sees the bill, sustainability sees the emissions, the floor sees the machines. Nobody sees all three at once.
The next action is unclear.
Dashboards show what happened. They don’t say what to fix first, or what it’s worth.
Getting past the wall is the work. That’s what Groundshift does.
03What Groundshift does
We turn messy operational and climate data into business intelligence.
Factory and office, connected and traceable.
Bills, meters and machines map into one flow, from what you buy to what it powers.
Grid electricity
Plant ACompressed air
Compressor 2Chiller loop
Chiller 1Frozen goods line
A clear path to lower cost and carbon.
Every action is ranked by what it saves and how much effort it takes.
Move Plant A to the time-of-use tariff
Fix compressor drift at Warehouse B
Shift chiller runs to off-peak hours
Lower costs, lower emissions, real impact.
Savings are tracked against the plan, in money and in tCO₂e.
฿0.00M
0.0tCO₂e
0%
04How it works
Your data is too valuable to be used only for reporting.
Drop in your bills. Get every line item.
The agent reads PDFs and spreadsheets, extracts each line with its cost and emissions, and flags anything it isn’t sure about.
September bills
Results
Draft v1- Files
- 2
- Line items
- 6
- Cost
- ฿512.4K
- Emissions
- 58.7
Metadata
Properties
Map how energy flows through your sites.
Connect what you buy to the processes and lines it powers, so every baht and every kilogram has a place.
Plant A energy flow
Workflow
Plant A energy flow
About
On the canvas
Connection
Grid electricityCompressed air
Split ratio
Share of Grid electricity’s output that goes to Compressed air.
All splits from Grid electricity
Track savings against the plan.
Cost and carbon side by side, over time, against the target you set.
Savings trajectory
Cumulative savings from deployed plans against their target, since the first plan went live.
- Target to date
- ฿0K
- Actual to date
- ฿0K
- Achieved
- 0.0%
Act on what’s worth it, and see it through.
Each action shows why it’s suggested, what changes and how much effort it takes, from backlog to done.
Q4 energy plan
Move Plant A to the time-of-use tariff
Fix compressor drift at Warehouse B
Shift chiller runs to off-peak hours
Move Plant A to the time-of-use tariff
September bills
I read 2 bills and found 6 line items: ฿512.4K and 58.7 tCO₂e in total.
Every line matched its bill’s total, so confidence is high across the board.
05The actions
Curated for what you can actually do.
Every action says why we suggest it, what kind of change it is and what it takes. Start with what you can do this month.
- TRFWhy we suggest it
- Kind of change
- Effort
5 of 9 actions · No new hardware
Move Plant A to the time-of-use tariff
Fix compressor drift at Warehouse B
Shift chiller runs to off-peak hours
Renegotiate the LPG rate with your supplier
Switch to a lower-carbon packaging film supplier
Fit variable-speed drives to the cooling-tower fans
Sign a rooftop solar PPA for Plant A
Replace Boiler 2 with a heat pump
Check compressed-air leaks every week
06Why it’s different
Built to change how you operate, not just to report.
01Cost and carbon in one model, not two reports.
Properties · Electricity · on-peak
Every line item carries its cost and its emissions, so each action is weighed on both at once.
02Science first. Any standard is a view, not a rebuild.
Grid electricity
Plant ACompressed air
Compressor 2We model how energy and materials physically flow. Reporting to a standard reads from that model, so a new one doesn’t mean starting over.
03Data from the factory floor, not just spreadsheets.
Metadata · Electricity · on-peak
Start from bills and files; connect meters and machines as you go, so the model follows what the plant actually does.
04No outside consultants. Your team stays in control.
Action · Tariff structure
Move Plant A to the time-of-use tariff
Why we suggest it
Tariff structure. A better rate available under your current tariff plan.
The agent does the reading and the modelling. Your people see why each action is suggested and decide what moves forward.
Properties · Electricity · on-peak
01Every line item carries its cost and its emissions, so each action is weighed on both at once.
07The stack
One intelligence layer. Many ways in.
Everything runs on one model of your cost and carbon. Data comes in however you have it today, and more channels are coming.
01Ways in
Bills, files and hard copiesLive
Dropped into chat, read by the agent.
Edge™Live
A cabinet that connects factory PLCs.
Sentinel™Coming
Factory sensors.
Planar™Coming
Satellite and drone data.
02Intelligence layer
Operating system
Bifrost OS™
One model that turns every source into cost and carbon, side by side.
03Where you work
Web app
Groundshift™
Chat, workflows, Home and actions: the screens shown above.
08How we start
From a call to your first plan.
- 01
Book a call
Tell us about your sites, your bills and what you want to change.
- 02
Share a few bills
A few recent bills are enough to start: PDFs, spreadsheets or scans.
- 03
See your first plan
Your energy flow mapped, and the first actions worth taking, with what each saves.
- 04
Roll out site by site
Add sites, meters and machines as you go. Your team runs it from there.